Stellux LED郑州星极照电子产品有限公司
Request a stock check

SIX-STEP SOP

One batch.
Six controlled gates.

A product can move to published inventory only when its identity, condition and functional record are clear. Each step creates an output the next step can verify.

MOVE-TO-PREVIEW QUALITY ROUTE

Move across the route to inspect each controlled gate.

LIVE PREVIEWMove the pointer along the route to change the page. Click once to hold a stage.
R01 QUALITY GATE 01

ACTIVE QUALITY GATE / R01

Receiving

Assign a tracking number, reconcile cabinet quantity and photograph the lot before inspection begins.A traceable starting point prevents later test photos, repair notes or packing records from being attached to the wrong batch.

How we operate

  • Assign one lot number before cabinets are separated.
  • Count cabinets, modules, cables and accessories against the source handover.
  • Photograph the arrival condition and keep the records with the lot.

Recorded output

  • Tracking identity
  • Source quantity
  • Arrival images

REAL PROCESS MEDIA

Aging and dispatch are visible, not implied.

Open the complete evidence guide →
LED poster screens powered on during an aging test
72H AGING / POWER-ON RECORD
Flight cases prepared for dispatch
PACKING / CASE COUNT

START WITH A TRACKABLE LOT

Send the target specification and destination.

Create an inquiry →