Stellux LED郑州星极照电子产品有限公司
Request a stock check

GRADING & PRICING

A used screen is only
as credible as its evidence.

The Stellux system links production age, cabinet appearance and functional stability to a commercial grade buyers can understand.

THE THREE-LAYER CHECK

Age. Appearance. Function.

Open each dimension to see the criteria behind the code shown on a batch record.
Y

Age code

The production period is checked against cabinet labels and the batch record.

  • Y1Under 1 year
  • Y21–3 years
  • Y33–5 years
  • Y4Over 5 years
See required evidence
C

Cosmetic code

Cabinet surfaces, corners, locks and connectors are recorded cabinet by cabinet.

  • C1Pristine or minimal handling marks
  • C2Minor normal-use wear
  • C3Visible scratches or small dents
  • C4Heavy wear or deformation
See required evidence
F

Functional result

Power, cards, modules, pixels and color output are checked before a lot is published.

  • FFunctional checks passed
  • RRepair work recorded before re-test
  • A+–CCommercial result combines the verified dimensions
See required evidence

Stellux's codes are an internal commercial reference framework, not an independent third-party certification. Final grade and quotation are confirmed against the physical batch and its evidence record.

COMMERCIAL MATRIX

Reference value follows verified condition.

Percentages compare the batch with a verified new-unit benchmark. They are not a final quotation.
PremiumA+≤ 1 yearC1 / pristine65–75%
ExcellentA1–3 yearsC1–C250–60%
Very GoodB+2–4 yearsC2–C340–50%
GoodB3–5 yearsC330–40%
FairC5+ yearsC420–30%

SIX CONTROLLED STEPS

One workflow for every incoming lot.

Open the complete SOP page →
01

Receiving

A tracking number is assigned, cabinet quantity is reconciled with the source packing list and the lot enters the inspection zone.

Tracking number · quantity check · warehouse entry
02

Inspection

Production period, cabinet surfaces, corners, connectors and deformation are documented to establish age and cosmetic codes.

Age code · cosmetic code · image record
03

Repair

Dead pixels, power supplies, receiving cards and damaged parts are repaired or replaced, followed by calibration.

Component record · repair photos · calibration
04

72H Aging Test

The batch runs continuously for 72 hours. Scheduled checks expose intermittent faults, heat issues and color instability.

Continuous operation · scheduled checks · final result
05

Packing

Every cabinet receives a final clean and power-on check before flight cases or export crates are prepared and counted.

Final check · packing list · case reference
06

Shipping

Loading conditions are inspected, cases are secured, seal details are recorded and the shipping document set is completed.

Loading photos · seal number · export documents

BUY WITH THE RECORD

Ask for the grade sheet, test evidence and packing plan.

Start a verified stock check →